Construction quote template
Construction quote template for Australian builders
Price the build stage by stage, and say what is in and what is out, before you send it.
Sample data, not a customer’s quote Free, with no sign-up and no email form. Sample quote total including GST: A$138,050 (A$125,500 plus A$12,550 GST).
General information only. This is not legal or tax advice. Deposits, progress payments and building contracts have rules that differ by state and territory.
Sound like your week?
- Site measure 12 Nov, still not priced
- Two lines still a guess
- Promised for Friday
Wednesday 18 November. The site was measured on the 12th, three stages are priced, two lines are still a guess, and the quote is promised for Friday.
An example. The details are made up.
Stage by stage, in and out
Price the build stage by stage.
Say what is in and what is out, before you send it.
An example. The details are made up.
Worked sample quote, by stage
Sample
- 1A$6,400Preliminaries and site set-up, excluding GST.
- 2A$18,400Slab and footings, excluding GST.
- 3A$26,900Frame and roof, excluding GST.
- 4A$31,200Lock-up, excluding GST.
- 5A$28,600Fit-off, excluding GST.
- 6A$4,500Completion, excluding GST.
SAMPLE, NOT FOR ISSUE. Total A$138,050 including GST, with A$9,500 of allowances.
The two files
One quote on one sheet, priced by stage. Excel adds the stages, the allowances, the GST and the total for you.
| File | What is in it |
|---|---|
| Blank Excel quote | Your details, the customer and the site; eight stage lines, each with what it includes; allowances; the GST and the total; payment stages to write from your own contract; what is not included; variations; acceptance. |
| Sample Excel quote | The same sheet filled in for a made-up rear extension, marked SAMPLE, NOT FOR ISSUE. |
The payment stages are left blank on purpose. What you may take as a deposit, and when a progress payment may be claimed, depends on your state and your contract.
The detail, if you want it
How to use it
How to use it
Stage it.
Put each stage of the build on its own line, with what that stage includes.
Price it.
Enter each stage and each allowance excluding GST. The sheet adds the GST and the total.
Say what is out.
List what is not included, how a variation is agreed, and how long the price holds. Then send it.
Once the job starts, keep a progress claim record against each quoted stage. For a job that is not a build, use the general quote template.
A worked sample
A worked sample
Sample data, not a customer’s quote. Sample: rear extension, one bedroom and a bathroom, AUD.
| Stage or allowance | What it covers | Excluding GST |
|---|---|---|
| Preliminaries and site set-up | Site fencing, temporary power, set-out, skip bins | A$6,400 |
| Slab and footings | Excavation to plan levels, footings, slab, termite barrier | A$18,400 |
| Frame and roof | Wall frames, roof trusses, roof sheeting, gutters | A$26,900 |
| Lock-up | Windows, external doors, cladding, external paint | A$31,200 |
| Fit-off | Insulation, linings, internal doors, joinery, tiling, fixtures | A$28,600 |
| Completion | Final clean, defects walk-through, handover documents | A$4,500 |
| Prime cost item | Bathroom tapware and fittings, supply only | A$6,000 |
| Provisional sum | Rock excavation, if rock is found | A$3,500 |
| Subtotal | Six stages and two allowances | A$125,500 |
| GST | On the subtotal, in this sample | A$12,550 |
| Quote total | Including GST | A$138,050 |
The six stages come to A$116,000 and the two allowances to A$9,500. Together that is A$125,500 excluding GST, and A$138,050 with GST. The sample assumes every line is taxable. Ask your accountant whether that is true of your quote.
What a building quote should say
What a building quote should say
- The stages. Each stage as its own line, with what it includes, so the customer can see what each part of the price buys.
- What is not included. Written down, so nobody assumes it. In the sample: council and certifier fees; landscaping and fencing; floor coverings.
- Allowances. In this template a prime cost item is an allowance for something not yet chosen, such as tapware, and a provisional sum is an allowance for work that cannot be priced exactly yet, such as rock in the ground. Say how each is adjusted once the real cost is known.
- Variations. How a change is priced and agreed in writing before the work is done.
- Payment stages. From your own contract, within your state’s rules.
- How long the price holds, and how the customer accepts. A date, a name, a signature.
Deposits and contracts, state by state
Deposits and contracts, state by state
Each quotation is the regulator’s own words, or the law’s own words where the regulator’s page could not be read, read at its source on 19 November 2026. Rules change: open the source before you rely on it.
| State or territory | Deposit, in the regulator’s or the law’s words | Written contract, in the regulator’s or the law’s words |
|---|---|---|
| New South Wales | ‘Under NSW home building law, the maximum deposit you can be asked to pay is 10 percent.’ NSW Government: Contracts for residential building work (last updated 29 April 2026) | ‘Your chosen builder or tradesperson must give you a written contract if the contract price is: over $5,000 (including GST), or unknown but the reasonable market cost of the labor and materials is more than $5,000 (including GST).’ NSW Government: Contracts for residential building work (last updated 29 April 2026) |
| Victoria | ‘By law, a deposit can be no more than: 10 per cent, if the total contract price is less than $20,000; five per cent, if the total contract price is $20,000 or more.’ Consumer Affairs Victoria: Deposits and payments for domestic building (last updated 9 July 2025) Consumer Affairs Victoria also says: ‘The new laws will take effect by 1 December 2026.’ and ‘For now, the current laws remain the same.’ Consumer Affairs Victoria: New domestic building contract laws passed in Victoria (15 September 2025) | ‘you must have a major domestic building contract for most work worth more than $10,000, even if your client is an owner builder’ Consumer Affairs Victoria: Deposits and payments for domestic building (last updated 9 July 2025) |
| Queensland | ‘The maximum deposit for works valued at $3,300 or less is 20%. … If the works are valued at $3,301 to $19,999: The maximum deposit for these contracts (level 1) is 10% of the contract price. If the works are valued at more than $20,000: The maximum deposit for these contracts (level 2) is 5% of the contract price.’ QBCC: Deposits and progress payments (last reviewed 27 June 2025) The same page, under ‘Exception to maximum deposits’: ‘A deposit of up to 20% is allowed in limited circumstances where substantial customised building work or prefabrication is performed away from the building site and this work represents more than 50% of the total contract price (including labour, materials and GST).’ QBCC: Deposits and progress payments (last reviewed 27 June 2025) | ‘You need a written contract if you’re carrying out domestic building work priced over $3,300 including labour, materials and GST.’ QBCC: Domestic building contracts (last reviewed 26 June 2024) |
| Western Australia | ‘The maximum deposit that your builder or tradesperson can require before they start work is 6.5 per cent of the contract price. The Act does not apply to contracts that are valued below $7,500 or over $500,000 and therefore there is no limit to the amount of deposit a builder may request for contracts with values below or over these amounts.’ Building and Energy, WA Government: Building or renovating your home (last updated 21 September 2026) | ‘A contractual complaint can also be made in relation to home building work contracts valued between $7,500 and $500,000, and the maximum deposit that can be requested is 6.5 per cent of the total contract cost. Contracts must be in writing and signed by both parties.’ Building and Energy, WA Government: Building or renovating your home (last updated 21 September 2026) |
| South Australia | ‘For contract amounts of $20,000 or more it should be no more than five percent of the total.’ SA.GOV.AU: Builder responsibilities (page last updated 10 November 2025) | ‘You must have a written contract if the domestic building work is worth $20,000 and more.’ SA.GOV.AU: Builder responsibilities (page last updated 10 November 2025) |
| Tasmania | ‘A building contractor must not, before starting to perform residential building work under a residential building work contract, demand or receive a deposit under the contract of more than – (a) if the contract price is equal to or more than the set amount and is not a contract price to which paragraph (c) applies – 5% of the contract price; or (b) if the contract price is less than the set amount and is not a contract price to which paragraph (c) applies – 10% of the contract price; or (c) for a residential building work contract under which the value of the off-site work is more than 50% of the contract price – 20% of the contract price.’ Tasmanian Legislation: Residential Building Work Contracts and Dispute Resolution Act 2016, section 41(2) (the version in force on 19 November 2026) The set amount: ‘For paragraph (a) of the definition of set amount in section 41(1) of the Act, the set amount of $50 000 is prescribed.’ Tasmanian Legislation: Residential Building Work Contracts and Dispute Resolution Regulations 2026, regulation 6 (in effect from 2 November 2026) Where the Act does not apply: ‘This Act does not apply to, or in relation to, residential building work that – (a) is performed, or is to be performed, for a contract price that is less than $20 000 or another greater amount, if any, that is prescribed by the regulations’ Tasmanian Legislation: Residential Building Work Contracts and Dispute Resolution Act 2016, section 9 (the version in force on 19 November 2026) | ‘A building contractor who enters into a residential building work contract must ensure the contract – (a) is in written form when it is entered into; or (b) is put into written form – (i) as soon as practicable (but in any case within 5 business days) after it is entered into; and (ii) before residential building work begins to be performed under the contract.’ Tasmanian Legislation: Residential Building Work Contracts and Dispute Resolution Act 2016, section 13 (the version in force on 19 November 2026) Where the Act does not apply: ‘This Act does not apply to, or in relation to, residential building work that – (a) is performed, or is to be performed, for a contract price that is less than $20 000 or another greater amount, if any, that is prescribed by the regulations’ Tasmanian Legislation: Residential Building Work Contracts and Dispute Resolution Act 2016, section 9 (the version in force on 19 November 2026) |
| Northern Territory | ‘A prescribed building contractor who has entered into a residential building contract must not request or receive a deposit from the contracting owner of more than 5% of the total contracted price of the prescribed building work specified in the contract.’ Northern Territory Legislation: Building Regulations 1993, regulation 41HE(1) (as in force at 30 March 2026) What that contract is: ‘residential building contract means a contract entered into under section 48B(1).’ Northern Territory Legislation: Building Act 1993, section 4 (as in force at 10 February 2026) Where section 48B(1) does not apply: ‘Subsection (1) does not apply if: (a) the value of the building work is less than the prescribed amount’ Northern Territory Legislation: Building Act 1993, section 48B(3) (as in force at 10 February 2026) ‘For section 48B(3)(a) of the Act, the prescribed amount is $25 000.’ Northern Territory Legislation: Building Regulations 1993, regulation 41J (as in force at 30 March 2026) Which builders: ‘For section 48B(1) of the Act, the following building contractors are prescribed: (a) a building contractor residential (restricted); (b) a building contractor residential (unrestricted).’ Northern Territory Legislation: Building Regulations 1993, regulation 41F (as in force at 30 March 2026) Which work: ‘For section 48B(1) of the Act, prescribed building work is work for or in connection with the construction of any of the following: (a) a Class 1a detached house; (b) a Class 10 building attached to a Class 1a detached house if it is constructed at the same time as the house is constructed; (c) a retaining wall (whenever constructed) that is not attached to a Class 1a detached house but on which the integrity of such a house depends.’ Northern Territory Legislation: Building Regulations 1993, regulation 41G(1) (as in force at 30 March 2026) ‘However, the prescribed building work does not include work for or in connection with the construction of any of the following: (a) renovations or alterations to an existing Class 1a detached house if there is no increase in the floor area of the house; (b) a Class 10 building or verandah attached to a Class 1a detached house if it is constructed at any time after the house was constructed; (c) a Class 10 building (whenever constructed) that is not attached to a Class 1a detached house, other than a retaining wall referred to in subregulation (1)(c).’ Northern Territory Legislation: Building Regulations 1993, regulation 41G(2) (as in force at 30 March 2026) ‘In addition, the prescribed building work does not include work for or in connection with: (a) the relocation of an approved Class 1a Building to approved rural land; or (b) post-relocation building work.’ Northern Territory Legislation: Building Regulations 1993, regulation 41G(3) (as in force at 30 March 2026) | Section 48B asks for a contract; it does not use the words ‘in writing’. ‘A prescribed building contractor must not commence or continue to carry out prescribed building work unless the building contractor has entered into a contract with the owner of the land on which the building work is to be carried out or with a person authorised by the owner to enter into the contract.’ Northern Territory Legislation: Building Act 1993, section 48B(1) (as in force at 10 February 2026) Which builders, which work and from what value: quoted in this row’s deposit cell, from section 48B(3) and regulations 41J, 41F and 41G. |
| Australian Capital Territory | The Building Act 2004 and the Building (General) Regulation 2008, as republished on 10 November 2026, name no maximum deposit. What they say about a deposit is what the insurer pays back when a builder becomes insolvent and the work is unfinished: ‘However, if the owner has paid a deposit on the work and the cost of any work done is less than the amount of the deposit, the owner may recover from the insurer the lesser of the following amounts: (a) the amount of the deposit less the cost of any work done; (b) the amount prescribed under the regulations less the cost of any work done.’ ACT Legislation Register: Building Act 2004, section 93(3) (republication 57, effective 10 November 2026) The amount prescribed for section 93(3)(b), which the regulation heads ‘If builder defaults and work less than deposit paid’: ‘The amount is $10 000.’ ACT Legislation Register: Building (General) Regulation 2008, section 43 (republication 53, effective 10 November 2026) Where part 6 of the Act, which holds section 93, does not apply: ‘The Act, part 6 (Residential building work—warranties, conditions, insurance etc) does not apply to residential building work if the cost of the work is less than $12 000.’ ACT Legislation Register: Building (General) Regulation 2008, section 37 (republication 53, effective 10 November 2026) Ask Access Canberra before you rely on this. | The same two laws name no price above which a contract must be in writing. What they ask to be attached to a contract: ‘A regulation may prescribe the documents (the required documents) that must be attached to a residential building work contract.’ ACT Legislation Register: Building Act 2004, section 89D(1) (republication 57, effective 10 November 2026) ‘A document determined by the Minister is prescribed.’ ACT Legislation Register: Building (General) Regulation 2008, section 38A(1) (republication 53, effective 10 November 2026) Where part 6 of the Act, which holds section 89D, does not apply: ‘The Act, part 6 (Residential building work—warranties, conditions, insurance etc) does not apply to residential building work if the cost of the work is less than $12 000.’ ACT Legislation Register: Building (General) Regulation 2008, section 37 (republication 53, effective 10 November 2026) Ask Access Canberra before you rely on this. |
These lines are quoted, not summarised (a list on a regulator’s page or in an Act is joined into one line), and each applies only to the work its source describes. For Tasmania, the Northern Territory and the ACT the regulator’s own page could not be read when this was written, so those rows quote the Act and the regulations from each government’s legislation register. In every row the words outside the quotation marks are this page’s; a quotation may stop at the end of the part that applies, and a mark of omission (…) shows where a sentence between two quoted lines is left out. Victoria’s rules are changing: read its regulator’s notice in the table. They are not legal advice. Your regulator or your legal adviser can tell you how the rule applies to your job.
Questions
Questions
What goes in a construction quote?
The stages of the build with what each includes, the allowances, what is not included, the GST and the total, how a variation is agreed, the payment stages from your contract, how long the price holds and how the customer accepts. The template has a place for each.
Should the quote show GST?
The template shows the amount excluding GST, the GST and the total including GST, so the customer sees all three. Whether GST applies to you and to each line is a question for your accountant.
What is the difference between a prime cost item and a provisional sum?
In this template a prime cost item is an allowance for an item not yet chosen, such as tapware. A provisional sum is an allowance for work that cannot be priced exactly yet, such as rock in the ground. Your contract and your state’s rules say how each must be shown and adjusted.
How much deposit can I take?
It depends on your state or territory and on the job. The table on this page quotes each regulator’s own page, or the law itself for Tasmania, the Northern Territory and the ACT. This page gives no figure of its own.
If quotes are going out late because they are typed up at night, see quotes and enquiries. Find the other templates in all Works Better calculators.
Sources
Sources
- NSW Government, Contracts for residential building work, last updated 29 April 2026. Read 19 November 2026.
- Consumer Affairs Victoria, Deposits and payments for domestic building, last updated 9 July 2025. Read 19 November 2026.
- Consumer Affairs Victoria, New domestic building contract laws passed in Victoria, 15 September 2025. Read 19 November 2026.
- QBCC, Deposits and progress payments, last reviewed 27 June 2025. Read 19 November 2026.
- QBCC, Domestic building contracts, last reviewed 26 June 2024. Read 19 November 2026.
- Building and Energy, WA Government, Building or renovating your home, last updated 21 September 2026. Read 19 November 2026.
- SA.GOV.AU, Builder responsibilities, page last updated 10 November 2025. Read 19 November 2026.
- Tasmanian Legislation, Residential Building Work Contracts and Dispute Resolution Act 2016, the version in force on 19 November 2026. Read 19 November 2026.
- Tasmanian Legislation, Residential Building Work Contracts and Dispute Resolution Regulations 2026, in effect from 2 November 2026. Read 19 November 2026.
- Northern Territory Legislation, Building Regulations 1993, as in force at 30 March 2026. Read 19 November 2026.
- Northern Territory Legislation, Building Act 1993, as in force at 10 February 2026. Read 19 November 2026.
- ACT Legislation Register, Building Act 2004, republication 57, effective 10 November 2026. Read 19 November 2026.
- ACT Legislation Register, Building (General) Regulation 2008, republication 53, effective 10 November 2026. Read 19 November 2026.
The layout of the sheet, its stages and its formulas are this template’s own design, not rules from any regulator. The sample job, its prices and its allowances are made up.
Renzo Demartini, Chartered Accountant (CA ANZ)
Drafted with AI, reviewed and spot-checked by me.
Sample data, not a customer’s quote. SAMPLE, NOT FOR ISSUE on the sample file. General information only. This is not legal or tax advice.
I get the systems you already have talking to each other and working together, so you get your nights and weekends back and are home for dinner.
RenzoRenzo Demartini, Chartered Accountant
Works with Xero, MYOB, QuickBooks, n8n and Zapier, your job software, and whatever else you run.
Get a free fit check by email
Send the form with the workflow to fix and your email. Your software, team size and timing are optional, but they help. I reply by email, usually with a question or two, and tell you whether it's a fit. No call needed. If it is, the next step is the A$1,500 Workflow Audit.
Thanks, it's with me.
Example · how an automation handles an enquiry
- Your enquiry arrivesThe workflow you want fixed
- AI drafts the replyThank you. I will contact you very soon.
- Renzo reads it and replies himselfBy email, usually with a question or two
See you soon. Renzo
I read every enquiry myself and reply by email to the address you gave, .
Next, I reply by email, usually with a question or two, and tell you whether it is a fit. No call needed.
If it is a fit, the step after that is the A$1,500 Workflow Audit.
In the meantime, see how each build runs: worksbetter.ai/#builds
Sending saves your details in HubSpot so I can reply. No mailing list. No payment is taken. How your enquiry is handled.