Today. Each claim starts with working out what was claimed last time.
Progress claim template
Progress claim template for trades
Reconcile completed work, variations, retention and earlier claims, then keep dates and evidence with the claim.
Progress claims need a clear trail from completed work to the amount requested. This progress claim template keeps the contract, variations, retention, earlier claims and payment records together.
The short answer: download the blank and SAMPLE files, then replace the assumptions with your own records. Check your state’s Act and your contract before using the document. Get construction-law advice for a dispute.
Download the claim record
SAMPLE, NOT FOR ISSUE: A$23,750.00 before GST + A$2,375.00 GST = A$26,125.00 this claim.
Six files, three formats.
| Format | Blank and SAMPLE |
|---|---|
| Word | Editable fields, manual totals |
| Excel | Visible formulas and input checks |
| Printable record, manual totals |
The files contain the same business fields. They include a claim summary, twenty work lines, a dates diary and an evidence index. Nothing in a file serves a claim, confirms an entitlement or chooses a deadline.
Keep one claim reference and revision across the files. Use the quote template for the earlier offer. Use the work order for the crew’s instruction and visit record. This download follows the completed work into the claim record.
The complete blank and SAMPLE records appear here, with matching fields.
Blank record, every field
BLANK TEMPLATE: complete and review before use. Progress claim WB-PC-2026-11-06-v1.
A claim document you adapt. It does not decide whether it meets your Act or contract: check both, and get advice for a dispute. Not a tax invoice.
Claim
- Row 6: Project reference
- Empty
- Row 7: Claim reference
- Empty
- Row 8: Claimant record
- Empty
- Row 9: Respondent record
- Empty
- Row 10: Contract reference and date
- Empty
- Row 11: Job and scope description
- Empty
- Row 12: State or territory
- Empty
- Row 13: Work period starts
- Empty
- Row 14: Work period ends
- Empty
- Row 15: Prepared date
- Empty
- Row 16: Claim document date
- Empty
- Row 17: Actual service record
- Empty
- Row 18: Contract stage/payment schedule reference
- Empty
- Row 19: Payment schedule response date, entered
- Empty
- Row 20: Payment due date, entered
- Empty
- Row 21: Date basis, source and responsible role
- Empty
- Row 22: Original contract sum, A$ excluding GST
- Empty
- Row 23: Retention held to date, A$ excluding GST
- Empty
- Row 24: Retention held before this claim, A$ excluding GST
- Empty
- Row 25: GST on this claim, entered A$
- Empty
- Row 26: Confirmed tax basis/reference
- Empty
- Row 27: GST on previous claims, entered A$
- Empty
- Row 28: Payments against previous claims, A$ including GST
- Empty
- Row 29: Current assessed/certified amount, A$ including GST
- Empty
- Row 30: Reviewer role
- Empty
- Row 31: Release decision
- Hold
- Row 32: Next action
- Empty
- Row 33: Previous claim reference(s)
- Empty
- Row 34: Arithmetic state
- Formula in Excel; manual check in Word and PDF
Results (Excel calculates; Word and PDF are worked by hand)
- Row 36: Revised contract, A$ excluding GST
- Empty
- Row 37: Base work completed to date, A$ excluding GST
- Empty
- Row 38: Variations completed to date, A$ excluding GST
- Empty
- Row 39: Completed value to date, A$ excluding GST
- Empty
- Row 40: Previous gross work claimed, A$ excluding GST, before retention
- Empty
- Row 41: Current gross work movement, A$ excluding GST, before retention
- Empty
- Row 42: Retention movement on this claim, A$ excluding GST
- Empty
- Row 43: This claim, A$ excluding GST, after retention
- Empty
- Row 44: Entered GST on this claim, A$
- Empty
- Row 45: This claim, A$ including GST
- Empty
- Row 46: Cumulative claim, A$ excluding GST, after retention
- Empty
- Row 47: Previous claim, A$ excluding GST, after prior retention
- Empty
- Row 48: Previous GST, entered A$
- Empty
- Row 49: Previous claims, A$ including GST
- Empty
- Row 50: Previous unpaid balance, A$ including GST
- Empty
- Row 51: All claims including this one, A$ including GST
- Empty
- Row 52: Retention held to date, A$ excluding GST
- Empty
- Row 53: Unclaimed contract value, A$ excluding GST, before retention
- Empty
- Row 54: Previous receipts, A$ including GST
- Empty
- Row 55: Current assessment, A$ including GST
- Empty
- Row 56: Current assessment less current claim, A$ including GST
- Empty
Document fields
- Row 58: Applicable wording/forms to obtain
- Empty
- Row 59: Document boundary
- A claim document you adapt. It does not decide whether it meets your Act or contract: check both, and get advice for a dispute. Not a tax invoice.
- Row 60: Saved record location
- Empty
- Row 61: Revision
- Empty
- Row 62: Notes
- Empty
- Row 63: Actual claimant identity, ABN and applicable licence details
- [claimant identity, ABN and licence details where applicable]
- Row 64: Actual respondent identity and applicable ABN
- [respondent identity and ABN where applicable]
- Row 65: Verified payment instructions
- [verified payment instructions]
- Row 66: Additional required wording/forms and attachments
- [additional wording, forms and attachments required for your job]
Work lines
| Line ID | Type | Contract item or variation description | Allocated contract value, A$ excl. GST | Completed value to date, A$ excl. GST | Previously claimed gross work value, A$ excl. GST, before retention | Contract or variation authority reference | Work evidence reference | This claim, gross, A$ excl. GST |
|---|---|---|---|---|---|---|---|---|
| W01 | ||||||||
| W02 | ||||||||
| W03 | ||||||||
| W04 | ||||||||
| W05 | ||||||||
| W06 | ||||||||
| W07 | ||||||||
| W08 | ||||||||
| W09 | ||||||||
| W10 | ||||||||
| W11 | ||||||||
| W12 | ||||||||
| W13 | ||||||||
| W14 | ||||||||
| W15 | ||||||||
| W16 | ||||||||
| W17 | ||||||||
| W18 | ||||||||
| W19 | ||||||||
| W20 |
| Totals | Allocated contract value, A$ excl. GST | Completed value to date, A$ excl. GST | Previously claimed gross work value, A$ excl. GST | This claim, gross, A$ excl. GST |
|---|---|---|---|---|
| All active work | ||||
| Base totals | ||||
| Variation totals |
Dates diary
| Event ID | Event | Date entered | Actual record/status | Source or basis | Responsible role | Next action |
|---|---|---|---|---|---|---|
| D01 | Work period ends | |||||
| D02 | Prepared | |||||
| D03 | Planned service | |||||
| D04 | Payment schedule response date | |||||
| D05 | Payment due date | |||||
| D06 | Internal follow-up | |||||
| D07 | Retention review |
Evidence index
| Evidence ID | Related claim/line | Record or file reference | Purpose | Opened by role/date | Result | Action |
|---|---|---|---|---|---|---|
| EV-PC-01 | ||||||
| EV-PC-02 | ||||||
| EV-PC-03 | ||||||
| EV-PC-04 | ||||||
| EV-PC-05 |
SAMPLE record, not for issue
SAMPLE, NOT FOR ISSUE: illustrative records, not client data. Progress claim WB-PC-2026-11-06-v1.
A claim document you adapt. It does not decide whether it meets your Act or contract: check both, and get advice for a dispute. Not a tax invoice.
Claim
- Row 6: Project reference
- JOB-SAMPLE-7201
- Row 7: Claim reference
- PC-SAMPLE-7203
- Row 8: Claimant record
- Contractor A, sample
- Row 9: Respondent record
- Customer A, sample
- Row 10: Contract reference and date
- CONTRACT-SAMPLE-7201, 1 September 2026
- Row 11: Job and scope description
- Sample commercial maintenance fit-out, packages W01 to W03
- Row 12: State or territory
- Not set: select your state or territory
- Row 13: Work period starts
- 1 October 2026
- Row 14: Work period ends
- 31 October 2026
- Row 15: Prepared date
- 6 November 2026
- Row 16: Claim document date
- 6 November 2026
- Row 17: Actual service record
- Not served: SAMPLE specimen
- Row 18: Contract stage/payment schedule reference
- SCHEDULE-SAMPLE-01; reference only, no legal form supplied
- Row 19: Payment schedule response date, entered
- DATE NOT SET: obtain and enter the confirmed dates
- Row 20: Payment due date, entered
- DATE NOT SET: obtain and enter the confirmed dates
- Row 21: Date basis, source and responsible role
- Not set: the response and payment dates depend on your Act and contract. Enter the confirmed dates, their source and the responsible role, and get advice.
- Row 22: Original contract sum, A$ excluding GST
- 120,000.00
- Row 23: Retention held to date, A$ excluding GST
- 3,250.00
- Row 24: Retention held before this claim, A$ excluding GST
- 2,000.00
- Row 25: GST on this claim, entered A$
- 2,375.00
- Row 26: Confirmed tax basis/reference
- SAMPLE assumption only: 10% of current net claim after retention. Not tax advice; confirm the actual taxable amount and timing.
- Row 27: GST on previous claims, entered A$
- 3,800.00
- Row 28: Payments against previous claims, A$ including GST
- 33,000.00
- Row 29: Current assessed/certified amount, A$ including GST
- Empty: assessment not received
- Row 30: Reviewer role
- Office reviewer role, sample
- Row 31: Release decision
- Hold
- Row 32: Next action
- Replace every SAMPLE record, confirm legal and tax position, then review saved document and attachments.
- Row 33: Previous claim reference(s)
- PC-SAMPLE-7202
- Row 34: Arithmetic state
- ARITHMETIC VALID
Results (Excel calculates; Word and PDF are worked by hand)
- Row 36: Revised contract, A$ excluding GST
- A$125,000.00
- Row 37: Base work completed to date, A$ excluding GST
- A$60,000.00
- Row 38: Variations completed to date, A$ excluding GST
- A$5,000.00
- Row 39: Completed value to date, A$ excluding GST
- A$65,000.00
- Row 40: Previous gross work claimed, A$ excluding GST, before retention
- A$40,000.00
- Row 41: Current gross work movement, A$ excluding GST, before retention
- A$25,000.00
- Row 42: Retention movement on this claim, A$ excluding GST
- A$1,250.00
- Row 43: This claim, A$ excluding GST, after retention
- A$23,750.00
- Row 44: Entered GST on this claim, A$
- A$2,375.00
- Row 45: This claim, A$ including GST
- A$26,125.00
- Row 46: Cumulative claim, A$ excluding GST, after retention
- A$61,750.00
- Row 47: Previous claim, A$ excluding GST, after prior retention
- A$38,000.00
- Row 48: Previous GST, entered A$
- A$3,800.00
- Row 49: Previous claims, A$ including GST
- A$41,800.00
- Row 50: Previous unpaid balance, A$ including GST
- A$8,800.00
- Row 51: All claims including this one, A$ including GST
- A$67,925.00
- Row 52: Retention held to date, A$ excluding GST
- A$3,250.00
- Row 53: Unclaimed contract value, A$ excluding GST, before retention
- A$60,000.00
- Row 54: Previous receipts, A$ including GST
- A$33,000.00
- Row 55: Current assessment, A$ including GST
- Not received
- Row 56: Current assessment less current claim, A$ including GST
- Not available
Document fields
- Row 58: Applicable wording/forms to obtain
- Not supplied: confirm for actual jurisdiction, contract and role.
- Row 59: Document boundary
- A claim document you adapt. It does not decide whether it meets your Act or contract: check both, and get advice for a dispute. Not a tax invoice.
- Row 60: Saved record location
- SAMPLE folder / JOB-SAMPLE-7201 / PC-SAMPLE-7203
- Row 61: Revision
- 1, SAMPLE
- Row 62: Notes
- No actual work, approval, service, payment or legal review is asserted by this specimen.
- Row 63: Actual claimant identity, ABN and applicable licence details
- [insert verified actual details]
- Row 64: Actual respondent identity and applicable ABN
- [insert verified actual details]
- Row 65: Verified payment instructions
- [insert independently verified payment instructions]
- Row 66: Additional required wording/forms and attachments
- Not supplied: obtain for the actual job
Work lines
| Line ID | Type | Contract item or variation description | Allocated contract value, A$ excl. GST | Completed value to date, A$ excl. GST | Previously claimed gross work value, A$ excl. GST, before retention | Contract or variation authority reference | Work evidence reference | This claim, gross, A$ excl. GST |
|---|---|---|---|---|---|---|---|---|
| W01 | Base | Sample package A | A$80,000.00 | A$48,000.00 | A$32,000.00 | CONTRACT-SAMPLE-7201 A | EV-PC-02 | A$16,000.00 |
| W02 | Base | Sample package B | A$40,000.00 | A$12,000.00 | A$8,000.00 | CONTRACT-SAMPLE-7201 B | EV-PC-02 | A$4,000.00 |
| W03 | Variation | Sample additional scope, no real approval asserted | A$5,000.00 | A$5,000.00 | A$0.00 | VAR-SAMPLE-7201 | EV-PC-03 | A$5,000.00 |
| W04 | ||||||||
| W05 | ||||||||
| W06 | ||||||||
| W07 | ||||||||
| W08 | ||||||||
| W09 | ||||||||
| W10 | ||||||||
| W11 | ||||||||
| W12 | ||||||||
| W13 | ||||||||
| W14 | ||||||||
| W15 | ||||||||
| W16 | ||||||||
| W17 | ||||||||
| W18 | ||||||||
| W19 | ||||||||
| W20 |
| Totals | Allocated contract value, A$ excl. GST | Completed value to date, A$ excl. GST | Previously claimed gross work value, A$ excl. GST | This claim, gross, A$ excl. GST |
|---|---|---|---|---|
| All active work | A$125,000.00 | A$65,000.00 | A$40,000.00 | A$25,000.00 |
| Base totals | A$120,000.00 | A$60,000.00 | A$40,000.00 | A$20,000.00 |
| Variation totals | A$5,000.00 | A$5,000.00 | A$0.00 | A$5,000.00 |
Dates diary
| Event ID | Event | Date entered | Actual record/status | Source or basis | Responsible role | Next action |
|---|---|---|---|---|---|---|
| D01 | Work period ends | 31 October 2026 | Period recorded, SAMPLE | Claim D14 | Office role, sample | Reconcile W01:W03 |
| D02 | Prepared | 6 November 2026 | Prepared specimen, SAMPLE | Claim D15 | Office role, sample | Replace SAMPLE records |
| D03 | Planned service | 6 November 2026 | Not served | Illustrative planning date, not an entitlement to serve | Office role, sample | Confirm actual permitted date/method and record receipt evidence |
| D04 | Payment schedule response date | NOT SET | Not set: SAMPLE | Not set: depends on your Act and contract | Adviser/reviewer role, sample | Obtain the job’s actual Act/contract basis |
| D05 | Payment due date | NOT SET | Not set: SAMPLE | Not set: depends on your Act and contract | Adviser/reviewer role, sample | Confirm the actual due date |
| D06 | Internal follow-up | Not set: SAMPLE | Internal example only, no legal extension inferred | Office role, sample | Set after the confirmed due date | |
| D07 | Retention review | NOT SET | Not set | Depends on actual agreement and advice | Contract owner role, sample | Obtain the actual trigger and date |
Evidence index
| Evidence ID | Related claim/line | Record or file reference | Purpose | Opened by role/date | Result | Action |
|---|---|---|---|---|---|---|
| EV-PC-01 | PC-SAMPLE-7203 | CONTRACT-SAMPLE-7201 and schedule | Contract and original allocation | Not opened: specimen | Not opened | Sample only: obtain and read actual contract |
| EV-PC-02 | W01, W02 | SAMPLE folder / work-period / completion-record | Completed values | Not opened: specimen | Not opened | Sample only: obtain actual supporting evidence |
| EV-PC-03 | W03 | VAR-SAMPLE-7201 | Changed scope and authority | Not opened: specimen | Not opened | Sample only: obtain actual decision and evidence |
| EV-PC-04 | PC-SAMPLE-7202 | SAMPLE folder / prior-claim / 6-October | Earlier gross work 40000, retention 2000 and GST 3800 | Not opened: specimen | Not opened | Sample only: reconcile actual prior claim |
| EV-PC-05 | Earlier receipts | RECEIPT-SAMPLE-7201, 30 October 2026 | Prior illustrative receipt 33000 including GST | Not opened: specimen | Not opened | Sample only: match actual bank record |
Renzo Demartini, Chartered Accountant (CA ANZ).
Sources read 6 November 2026.
Drafted with AI, reviewed and spot-checked by me.
General information only, not tax agent or legal advice. Confirm your contract and applicable law with a construction lawyer, and GST treatment with your accountant.
One claim, reconciled
Reconcile completed work, variations, retention and earlier claims.
Keep the dates and the evidence with the claim.
An example. The details are made up.
The detail, if you want it
Use it in three steps
Use it in three steps
Prepare
Contract, prior claim and work evidence
Reconcile
Completed value, retention, prior claims and GST
Review
Dates, attachments, authority and saved copy
Start from the contract breakdown. Record completed value against each line, with variations on separate rows. Keep the source reference beside every changed amount. The arithmetic uses cumulative completed value less previous claimed value. It does not substitute cash received for an earlier claim.
Carry the earlier retention and GST records forward separately. Enter the current GST amount confirmed for your work.
The SAMPLE requests A$26,125.00
The SAMPLE requests A$26,125.00
SAMPLE bridge, A$ excluding GST unless shown.
| SAMPLE bridge | A$, excluding GST unless shown |
|---|---|
| Base work completed | 60,000.00 |
| Completed variation | 5,000.00 |
| Retention held to date | (3,250.00) |
| Previously claimed, after earlier retention | (38,000.00) |
| This claim before GST | 23,750.00 |
| Entered GST, sample 10% | 2,375.00 |
| This claim including GST | 26,125.00 |
Sample data, not a customer’s claim. The original contract is A$120,000. A sample A$5,000 variation takes it to A$125,000. Completed work totals A$65,000, leaving A$60,000 of contract value unclaimed before retention.
The sample GST is 10% of A$23,750. The ATO’s calculation steps say “calculate 10% of this amount”. [1] That arithmetic does not decide the taxable amount, retention treatment or tax timing for your contract. Ask your accountant before entering GST.
Keep claimed, assessed and paid apart
Keep claimed, assessed and paid apart
SAMPLE record, A$ including GST.
| SAMPLE record | A$, including GST |
|---|---|
| Earlier claim | 41,800.00 |
| Earlier receipts | 33,000.00 |
| Earlier unpaid balance | 8,800.00 |
| Current assessment | Not received |
The earlier unpaid A$8,800 is shown separately. It is not quietly added to the current A$26,125. A receipt changes the payment record. It does not change the work completed or erase an earlier claim.
Record any assessment against this claim with its reference and reason. Use the unbilled variations calculator for wider exposure across jobs. This record covers one contract and one claim edition.
Record dates without guessing
Record dates without guessing
Where each date comes from.
| Date field | Where the answer belongs |
|---|---|
| Claim and service | Actual record and supporting evidence |
| Payment schedule response | Your applicable Act and contract, with advice |
| Payment due | Your applicable Act and contract, with advice |
The dates diary stores dates you enter. It counts no business days and applies no state rule. The SAMPLE leaves the response and payment dates unset: they depend on your Act and contract. Nothing here establishes when a live claim can be served or paid.
Keep the contract’s stage payment schedule distinct from a respondent’s payment schedule. Record the source, responsible role and next action for each date. A missing date stays visibly unset. Refer to the official links in Sources and ask a construction lawyer when the position is unclear.
Check the saved claim
Check the saved claim
Three checks before release.
| Check | Evidence to keep |
|---|---|
| Work and changes | Contract references and supporting records |
| Amounts | Prior claim, retention and confirmed GST basis |
| Release | Responsible reviewer, revision and saved document |
Arithmetic cannot establish authority or legal sufficiency. Open the saved PDF and every listed attachment. Keep the claim, response and receipts as separate records. Use the invoice template for a separate invoice when appropriate to your advised process.
The SAMPLE stays on Hold. Its evidence, dates and decisions are illustrative. General information only, not tax agent or legal advice. Start with a free fit check by email at the foot of this page.
Questions
Questions
What is in the progress claim template?
The six files contain a claim summary, work lines, a dates diary and an evidence index, with identical business headings. Word is editable, PDF is printable, and both use manual totals. Excel adds formulas and input checks, while the SAMPLE editions show how one illustrative claim reconciles.
Can the template confirm a valid payment claim?
No, it records your work and amounts, but it does not decide legal sufficiency, entitlement, service or timing. Check the Act applying to your state or territory and your contract before using it. Get construction-law advice for a dispute, a live response deadline or uncertainty about the required document.
Does it calculate the payment schedule deadline?
The dates diary stores the dates you enter and the evidence behind them. It does not count business days or choose a state rule. Keep the contract’s stage payment schedule separate from the respondent’s payment schedule, and ask your adviser to confirm the dates for your job.
How does the SAMPLE handle retention and GST?
The sample deducts A$3,250 retention held to date and A$38,000 previously claimed after earlier retention from A$65,000 completed value. Its current claim is A$23,750 before an entered A$2,375 GST amount. Those are illustrative assumptions, so ask your accountant about your actual taxable amount, retention treatment and timing.
Why are previous claims different from payments?
The earlier claim records what was requested, while a payment records money received. In the SAMPLE, A$41,800 was claimed earlier and A$33,000 was received, leaving A$8,800 separately unpaid. The workbook keeps that balance apart from the current claim, so a receipt cannot silently change the work-to-date calculation.
Should I use Word, Excel or PDF?
Choose Word to adapt the document, Excel for visible arithmetic, or PDF for a printable blank record. Each format has the same business fields and a filled SAMPLE. Read the saved copy, attachments and dates before sharing it, and keep the claim reference and revision together in your approved location.
Sources
Sources
Sources read 6 November 2026.
Check your state or territory’s current Act and your contract. Ask a construction lawyer about eligibility, required wording, service, response dates and payment dates. Get advice for a dispute.
- 1. Australian Taxation Office, Goods and services tax (GST), Fast facts (last modified 2 July 2025). smallbusiness.taxsuperandyou.gov.au/goods-and-services-tax/fast-facts Supports only the 10% arithmetic quoted for the SAMPLE, not a view on retention, taxable amount or timing.
- 2. Building Industry Fairness (Security of Payment) Act 2017, Queensland legislation. www.legislation.qld.gov.au/view/html/inforce/current/act-2017-043 Current version: 28 April 2026.
- 3. Building and Construction Industry Security of Payment Act 2002, Victoria legislation. www.legislation.vic.gov.au/in-force/acts/building-and-construction-industry-security-payment-act-2002 Version 015, in force from 24 June 2026.
- 4. Building and Construction Industry (Security of Payment) Act 2021, Western Australia legislation. www.legislation.wa.gov.au/legislation/statutes.nsf/law_a147300_currencies.html Version 00-f0-00, current from 21 October 2026.
- 5. Building and Construction Industry Security of Payment Act 2009, South Australia legislation. www.legislation.sa.gov.au/lz?path=%2FC%2FA%2FBUILDING%20AND%20CONSTRUCTION%20INDUSTRY%20SECURITY%20OF%20PAYMENT%20ACT%202009 Current authorised edition.
- 6. Building and Construction Industry (Security of Payment) Act 2009, ACT legislation. www.legislation.act.gov.au/a/2009-50/ R14 (current), 6 December 2025.
- 7. Construction Contracts (Security of Payments) Act 2004, Northern Territory legislation. legislation.nt.gov.au/Legislation/CONSTRUCTION-CONTRACTS-SECURITY-OF-PAYMENTS-ACT-2004 In force.
- 8. Building and Construction Industry Security of Payment Act 2009, Tasmania legislation. www.legislation.tas.gov.au/view/whole/html/current/act-2009-086 Authorised version: 14 July 2025.
- 9. Building and Construction Industry Security of Payment Act 1999, New South Wales legislation. legislation.nsw.gov.au/view/html/inforce/current/act-1999-046 Official NSW legislation site, linked for reference. Nothing from it is quoted here.
I get the systems you already have talking to each other and working together, so you get your nights and weekends back and are home for dinner.
RenzoRenzo Demartini, Chartered Accountant
Works with Xero, MYOB, QuickBooks, n8n and Zapier, your job software, and whatever else you run.
Get a free fit check by email
Send the form with the workflow to fix and your email. Your software, team size and timing are optional, but they help. I reply by email, usually with a question or two, and tell you whether it's a fit. No call needed. If it is, the next step is the A$1,500 Workflow Audit.
Thanks, it's with me.
Example · how an automation handles an enquiry
- Your enquiry arrivesThe workflow you want fixed
- AI drafts the replyThank you. I will contact you very soon.
- Renzo reads it and replies himselfBy email, usually with a question or two
See you soon. Renzo
I read every enquiry myself and reply by email to the address you gave, .
Next, I reply by email, usually with a question or two, and tell you whether it is a fit. No call needed.
If it is a fit, the step after that is the A$1,500 Workflow Audit.
In the meantime, see how each build runs: worksbetter.ai/#builds
Sending saves your details in HubSpot so I can reply. No mailing list. No payment is taken. How your enquiry is handled.